Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik
Fotografia © Sebastián Crespo / Bicubik

Hospital de Manta

 Torna enrere a la llista de projectes
Localització
2874+W9 Manta, Ecuador, Manta, Ecuador
Any
2018
Equip
Patricio Martínez, Maximia Torruella, Alex Herraez, Joana Cornudella, Luis Gotor, Alicia Palacios, Marta Gardeñes, Ana Santos
Constructor
Consorcio Manta Salud (Makiber, SA and Ripconciv)
Client
IESS (Ecuadorian Social Health Institute), Makiber SA

Criteria such as universal accessibility and parametric design consolidate the Manta Hospital, the third healthcare center designed by PMMT Architecture in Ecuador. This new building is one of the most advanced buildings in the healthcare sector.

The Manta Hospital was built accordingly to the parameters settled for the “Fluid Hospital”, a typology created by PMMT Architecture whose conceptualization and design are the result of a standardized method that starts with an in-depth analysis of the metric that defines the building, enabling an important time reduction fort the design, construction, equipment and commissioning processes.

Altres projectes per PMMT

Hospital Paramètric de Puyo
Puyo, Ecuador
Mercat Municipal a Creixell
Creixell, Spain
Centre d’investigació I Innovació Quirúrgica traslacional
Hospitalet de Llobregat, Spain
Consultori Local a Santa Agnés de Malanyanes
Santa Agnès de Malanyanes, Spain
Clínica de diagnòstic a Angola
Luanda, Angola