Airbus A380 hall

 Back to Projects list
Location
Hamburg, Germany
Year
2004

The extension of the Airbus production site in Hamburg-Finkenwerder called for the construction of an equipment hall with four bays for the long-range spacious Airbus A380. A cross-wing housing offices and the material storage is located at the southern side of the hall. The east and west facades of the hall are steel-glass structures. At the northern side of the hall each bay is equipped with a large gate for easy access and exit of the aircraft. The entire width of the hall may be opened.

The loadbearing structure of each bay consists of three parts: Steel structure: Two trussed girders and one trussed longitudinal girder make up the exterior main roof structure. Interior auxiliary trusses support the roof slab consisting of purlins, trapezoid metal sheet, insulation and asphalt sheeting. The truss members are welded S355 steel box-girders. Assembly platforms are suspended from the roof. Concrete structure: cross-wing for offices and supply storage. The hall floor rests on a beam grid supported by piles.

Client
Airbus Deutschland GmbH
Hamburg

Architecture
gmp · Architekten von Gerkan, Marg und Partner

Structural framework
sbp

Basic dimensions
100 x 360 m (four bays 100 x 90 m each)

Main trussed girder
33 m O.K.

Roof skin
22 m O.K.

Auxiliary trussed girder
19 m U.K.

Main truss runway girder
72 m span

Main truss-longitudinal girder
94 m span

Auxiliary trussed girder
38 m span

Material
S355

Photography
Heiner Leiska

Other Projects by schlaich bergermann partner

Weinberg Bridge - Federal Garden Show 2015 Havel Region
Rathenow, Germany
Railway Bridge Gänsebachtal
Thüringen, Germany
Stadium FK Krasnodar
Krasnodar, Russia
New Office Airport Stuttgart (NOAS) Ernst & Young
Stuttgart, Germany
Arena da Amazônia
Manaus, Brazil